Learning objectives
- Move a bottleneck without slowing the line
- Balance for real operator skill
Steps
- Draw operation flow and SMVs
- Compute target cycle time = shift time / target output
- Assign operations so no station exceeds cycle time
- Skill-match operators, then re-time
Factory example
A denim line where re-assigning one operation from the bottleneck operator to the next station lifted hourly output by 12%.
Common mistakes
- Balancing on paper without skill match
- Not re-balancing after a change